Description
Our “open” crane shelter structure on the South Mole was constructed to withstand a severe marine environment. Based on a hot dipped galvanised steel bolted design with wall rails and purlins to support trapezoidal sheet cladding finished in a spherical edge, our selection of materials will be able to withstand the extreme temperatures, humidity, wind gusts and salinity.
PROJECT DETAILS
Client: | - |
---|---|
Location: | South Mole |
Date: | 2015 |